lastID = -294187
Skip to main content Skip to top navigation Skip to site search
Top of page
  • My citations options
    Web Back (from Web)
    Chicago Back (from Chicago)
    MLA Back (from MLA)
Close action menu

You need to login to use this feature.

Please wait a moment…
Please wait while we update your results...
Please wait a moment...
Description: Access Water
Context Menu
Description: Book cover
Installation of Large Diameter Buried Pipes
  • Browse
  • Compilations
    • Compilations list
  • Subscriptions
Tools

Related contents

Loading related content

Workflow

No linked records yet

X
  • Current: 2022-05-06 11:38:20 Adam Phillips
  • 2022-05-06 11:38:19 Adam Phillips
  • 2020-02-01 00:33:15 Administrator
  • 2020-02-01 00:33:14 Administrator
  • 2020-02-01 00:33:13 Administrator
Description: Access Water
  • Browse
  • Compilations
  • Subscriptions
Log in
0
Accessibility Options

Base text size -

This is a sample piece of body text
Larger
Smaller
  • Shopping basket (0)
  • Accessibility options
  • Return to previous
Description: Book cover
Installation of Large Diameter Buried Pipes

Installation of Large Diameter Buried Pipes

Installation of Large Diameter Buried Pipes

  • New
  • View
  • Details
  • Reader
  • Default
  • Share
  • Email
  • Facebook
  • Twitter
  • LinkedIn
  • New
  • View
  • Default view
  • Reader view
  • Data view
  • Details

This page cannot be printed from here

Please use the dedicated print option from the 'view' drop down menu located in the blue ribbon in the top, right section of the publication.

screenshot of print menu option

Description: Book cover
Installation of Large Diameter Buried Pipes
Abstract
The ProblemThere is an ongoing need to provide designers, specifiers, engineers, consultants and students an overview and general understanding on the proper installation and rehabilitation of buried municipal and industrial pipelines to provide a long-lasting wastewater and potable water infrastructure that will serve future generations.Goals and ObjectiveMost buried pipe relies on interaction with the surrounding soil to carry loads. The properly designed pipe and joining system depends on proper soil support, and therefore proper installation, to provide good structural performance. This paper is about pipe types, joint types and soil types and how, through good design and installation, they interact to form effective piping-soil systems. The paper describes the basic structural assumptions that designers make on the installation of rigid and flexible pipe in specific soil conditions. Further, the paper and photographs describe and show the stages in pipeline open trench and trenchless construction – excavating the trench, preparing the foundations, placing the bedding, placing and compacting the embedment soil and back fill to design specifications in the construction of new and the rehabilitation of existing sewers and water transmission systems.The SolutionThe Institute shared sponsorship of the American Society of Civil Engineers ASCE video and handbook Design and Installation of Buried Pipes and is a voting member of ASTM D 3839 Standard Practice for Underground Installation of Fiberglass Pipe, and AWWA M-45 Fiberglass Pipe Design Manual. The paper is modeled after the installation portion of the ASCE video and addresses the following topics:a. Types of pipe, their materials and pipe joints. This section distinguishes between pressure and non-pressure pipe, rigid and flexible pipe and an introduction to the types of pipe joints.b. Site and environmental conditions. This section discusses variations in site topography that may influence the pipe design. Further, it discusses different types of soil types and densities, their strengths and stiffness.c. Pipe loading and soil interaction. This section discusses how to achieve favorable pressure distributions from soil and other loadings by following good installation practices. Further, there is a discussion on pipe bedding and how it affects rigid and flexible pipe performance.d. Pipe-soil excavation and construction. This section describes the design of first a foundation layer, next the bedding on which the pipe is placed and the laying of the pipe, then the embedment material placed between the pipe and trench wall and finally the trench backfill.e. Trenchless construction methods for new construction or rehabilitation of existing piping.f. Pipe joints and joining methods. This section describes the types of joints and methods by which they are installed.g. Testing and quality assurance. This section describes quality control, pipe and joint testing for leaks to ensure the quality of the pipe-soil system.ASCE Video and Handbook AvailabilityThe ASCE Design and Installation of Buried Pipes video provides a 30-minute scripted and graphic overview of how to properly install buried pipes complete with photographs showing equipment and field construction techniques. The video is available to the public through the ASCE Continuing Education library, 1801 Alexander Bell Drive, Reston, VA 20191-4400.
The ProblemThere is an ongoing need to provide designers, specifiers, engineers, consultants and students an overview and general understanding on the proper installation and rehabilitation of buried municipal and industrial pipelines to provide a long-lasting wastewater and potable water infrastructure that will serve future generations.Goals and ObjectiveMost buried pipe relies on interaction...
Author(s)
Sully Curran
SourceProceedings of the Water Environment Federation
SubjectSession 7: Collection Systems 101 – The Basics
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Oct, 2007
ISSN1938-6478
SICI1938-6478(20071001)2007:19L.505;1-
DOI10.2175/193864707786831390
Volume / Issue2007 / 19
Content sourceWEFTEC
First / last page(s)505 - 511
Copyright2007
Word count502
Subject keywordsASCEVIDEOASTM D 3839AWWA M-45PIPEMATERIALSJOINTSPRESSURENON-PRESSURERIGIDFLEXIBLEEXCAVATIONCONSTRUCTIONTRENCHLESS

Purchase price $11.50

Get access
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'Installation of Large Diameter Buried Pipes'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: Book cover
Installation of Large Diameter Buried Pipes
Pricing
Non-member price: $11.50
Member price:
-294187
Get access
-294187
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'Installation of Large Diameter Buried Pipes'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.

Details

Description: Book cover
Installation of Large Diameter Buried Pipes
Abstract
The ProblemThere is an ongoing need to provide designers, specifiers, engineers, consultants and students an overview and general understanding on the proper installation and rehabilitation of buried municipal and industrial pipelines to provide a long-lasting wastewater and potable water infrastructure that will serve future generations.Goals and ObjectiveMost buried pipe relies on interaction with the surrounding soil to carry loads. The properly designed pipe and joining system depends on proper soil support, and therefore proper installation, to provide good structural performance. This paper is about pipe types, joint types and soil types and how, through good design and installation, they interact to form effective piping-soil systems. The paper describes the basic structural assumptions that designers make on the installation of rigid and flexible pipe in specific soil conditions. Further, the paper and photographs describe and show the stages in pipeline open trench and trenchless construction – excavating the trench, preparing the foundations, placing the bedding, placing and compacting the embedment soil and back fill to design specifications in the construction of new and the rehabilitation of existing sewers and water transmission systems.The SolutionThe Institute shared sponsorship of the American Society of Civil Engineers ASCE video and handbook Design and Installation of Buried Pipes and is a voting member of ASTM D 3839 Standard Practice for Underground Installation of Fiberglass Pipe, and AWWA M-45 Fiberglass Pipe Design Manual. The paper is modeled after the installation portion of the ASCE video and addresses the following topics:a. Types of pipe, their materials and pipe joints. This section distinguishes between pressure and non-pressure pipe, rigid and flexible pipe and an introduction to the types of pipe joints.b. Site and environmental conditions. This section discusses variations in site topography that may influence the pipe design. Further, it discusses different types of soil types and densities, their strengths and stiffness.c. Pipe loading and soil interaction. This section discusses how to achieve favorable pressure distributions from soil and other loadings by following good installation practices. Further, there is a discussion on pipe bedding and how it affects rigid and flexible pipe performance.d. Pipe-soil excavation and construction. This section describes the design of first a foundation layer, next the bedding on which the pipe is placed and the laying of the pipe, then the embedment material placed between the pipe and trench wall and finally the trench backfill.e. Trenchless construction methods for new construction or rehabilitation of existing piping.f. Pipe joints and joining methods. This section describes the types of joints and methods by which they are installed.g. Testing and quality assurance. This section describes quality control, pipe and joint testing for leaks to ensure the quality of the pipe-soil system.ASCE Video and Handbook AvailabilityThe ASCE Design and Installation of Buried Pipes video provides a 30-minute scripted and graphic overview of how to properly install buried pipes complete with photographs showing equipment and field construction techniques. The video is available to the public through the ASCE Continuing Education library, 1801 Alexander Bell Drive, Reston, VA 20191-4400.
The ProblemThere is an ongoing need to provide designers, specifiers, engineers, consultants and students an overview and general understanding on the proper installation and rehabilitation of buried municipal and industrial pipelines to provide a long-lasting wastewater and potable water infrastructure that will serve future generations.Goals and ObjectiveMost buried pipe relies on interaction...
Author(s)
Sully Curran
SourceProceedings of the Water Environment Federation
SubjectSession 7: Collection Systems 101 – The Basics
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Oct, 2007
ISSN1938-6478
SICI1938-6478(20071001)2007:19L.505;1-
DOI10.2175/193864707786831390
Volume / Issue2007 / 19
Content sourceWEFTEC
First / last page(s)505 - 511
Copyright2007
Word count502
Subject keywordsASCEVIDEOASTM D 3839AWWA M-45PIPEMATERIALSJOINTSPRESSURENON-PRESSURERIGIDFLEXIBLEEXCAVATIONCONSTRUCTIONTRENCHLESS

Actions, changes & tasks

Outstanding Actions

Add action for paragraph

Current Changes

Add signficant change

Current Tasks

Add risk task

Connect with us

Follow us on Facebook
Follow us on Twitter
Connect to us on LinkedIn
Subscribe on YouTube
Powered by Librios Ltd
Powered by Librios Ltd
Authors
Terms of Use
Policies
Help
Accessibility
Contact us
Copyright © 2024 by the Water Environment Federation
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: WWTF Digital Boot 180x150
WWTF Digital (180x150)
Created on Jul 02
Websitehttps:/­/­www.wef.org/­wwtf?utm_medium=WWTF&utm_source=AccessWater&utm_campaign=WWTF
180x150
Sully Curran. Installation of Large Diameter Buried Pipes. Water Environment Federation, 2018. Web. 26 Aug. 2025. <https://www.accesswater.org?id=-294187CITANCHOR>.
Sully Curran. Installation of Large Diameter Buried Pipes. Water Environment Federation, 2018. Accessed August 26, 2025. https://www.accesswater.org/?id=-294187CITANCHOR.
Sully Curran
Installation of Large Diameter Buried Pipes
Access Water
Water Environment Federation
December 22, 2018
August 26, 2025
https://www.accesswater.org/?id=-294187CITANCHOR