lastID = -294541
Skip to main content Skip to top navigation Skip to site search
Top of page
  • My citations options
    Web Back (from Web)
    Chicago Back (from Chicago)
    MLA Back (from MLA)
Close action menu

You need to login to use this feature.

Please wait a moment…
Please wait while we update your results...
Please wait a moment...
Description: Access Water
Context Menu
Description: Book cover
BETWEEN A TREE AND A HARD PLACE: PUBLIC INVOLVEMENT IN SEWER SYSTEM PLANNING
  • Browse
  • Compilations
    • Compilations list
  • Subscriptions
Tools

Related contents

Loading related content

Workflow

No linked records yet

X
  • Current: 2022-05-04 20:16:55 Adam Phillips
  • 2022-05-04 20:16:54 Adam Phillips
  • 2020-03-26 22:10:27 Adam Phillips
  • 2020-03-26 22:10:26 Adam Phillips
  • 2020-01-31 20:25:53 Administrator
  • 2020-01-31 20:25:52 Administrator
Description: Access Water
  • Browse
  • Compilations
  • Subscriptions
Log in
0
Accessibility Options

Base text size -

This is a sample piece of body text
Larger
Smaller
  • Shopping basket (0)
  • Accessibility options
  • Return to previous
Description: Book cover
BETWEEN A TREE AND A HARD PLACE: PUBLIC INVOLVEMENT IN SEWER SYSTEM PLANNING

BETWEEN A TREE AND A HARD PLACE: PUBLIC INVOLVEMENT IN SEWER SYSTEM PLANNING

BETWEEN A TREE AND A HARD PLACE: PUBLIC INVOLVEMENT IN SEWER SYSTEM PLANNING

  • New
  • View
  • Details
  • Reader
  • Default
  • Share
  • Email
  • Facebook
  • Twitter
  • LinkedIn
  • New
  • View
  • Default view
  • Reader view
  • Data view
  • Details

This page cannot be printed from here

Please use the dedicated print option from the 'view' drop down menu located in the blue ribbon in the top, right section of the publication.

screenshot of print menu option

Description: Book cover
BETWEEN A TREE AND A HARD PLACE: PUBLIC INVOLVEMENT IN SEWER SYSTEM PLANNING
Abstract
The Orange Water and Sewer Authority (OWASA) is the water and sewer service provider for the areas of Chapel Hill and Carrboro, North Carolina. In the heart of Chapel Hill lies the University of North Carolina-Chapel Hill (UNC-CH) also serviced by OWASA through parallel 18-inch sewer mains referred to as the Meeting of the Waters Interceptor (MWI). These pipelines dating back to the 1940s were laid adjacent to the Meeting of the Waters Creek and continued downstream to the Mason Farm Wastewater Treatment Plant (WWTP). The MWI travels along the edge of a large property that was subsequently set aside by its owner, William Coker, for the University and made part of the North Carolina Botanical Garden (NCBG). This land was called the Coker Pinetum and is a valued part of the University's plan for protecting forested areas and significant trees. Downstream of the Coker Pinetum, the MWI runs along small local roads and then adjacent to the northern edge of the main NCBG property to the WWTP.Through recent master planning efforts for OWASA and UNC-CH, the existing 18-inch pipes of the MWI were identified as having insufficient capacity to convey future peak flows as the University continues its 1 billion expansion. Initial study recommendations suggested that replacing the aging clay pipes with a new single 36-inch ductile iron pipe would address the capacity issue. At the same time, OWASA was implementing a project to supply reclaimed water from the WWTP back to the UNC-CH campus for use in a variety of applications through a new 24-inch pressurized reclaimed water transmission main. These two projects would likely follow a similar route from the campus to the WWTP.Review of the natural topography of the area showed that the existing route along the Coker Pinetum was the only available corridor to allow gravity flow. OWASA staff presented the project to the local community in a public meeting to inform them of the issues and gather input. The NCBG staff and local residents, many who take personal interest in their adjacent forest, were concerned about the impact to the trees, creek, and disruption to the local roads of the adjoining neighborhoods. OWASA staff used the public input and implemented an Alternative Evaluation Project. Brown and Caldwell was retained to investigate various project alternatives (including construction of a new pump station to avoid piping through the Coker Pinetum area) using a Pairwise Comparison process. After developing a life-cycle cost analysis, investigating existing easements, preparing a thorough tree survey, and identifying pump station site requirements, the results were presented to the community.Using a thorough evaluation process and continuous communication with the local stakeholders, a project consensus was developed that OWASA is optimistic can be carried successfully through construction. This paper will review the decision-making and public involvement process and describe the challenges and accomplishments of the project.
The Orange Water and Sewer Authority (OWASA) is the water and sewer service provider for the areas of Chapel Hill and Carrboro, North Carolina. In the heart of Chapel Hill lies the University of North Carolina-Chapel Hill (UNC-CH) also serviced by OWASA through parallel 18-inch sewer mains referred to as the Meeting of the Waters Interceptor (MWI). These pipelines dating back to the 1940s were...
Author(s)
Christopher D. WilsonAlexandra Jones
SourceProceedings of the Water Environment Federation
SubjectSession 11: Gaining Support from your Most Important Customers-the Public
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2007
ISSN1938-6478
SICI1938-6478(20070101)2007:4L.735;1-
DOI10.2175/193864707787975174
Volume / Issue2007 / 4
Content sourceCollection Systems Conference
First / last page(s)735 - 745
Copyright2007
Word count486

Purchase price $11.50

Get access
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'BETWEEN A TREE AND A HARD PLACE: PUBLIC INVOLVEMENT IN SEWER SYSTEM PLANNING'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: Book cover
BETWEEN A TREE AND A HARD PLACE: PUBLIC INVOLVEMENT IN SEWER SYSTEM PLANNING
Pricing
Non-member price: $11.50
Member price:
-294541
Get access
-294541
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'BETWEEN A TREE AND A HARD PLACE: PUBLIC INVOLVEMENT IN SEWER SYSTEM PLANNING'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.

Details

Description: Book cover
BETWEEN A TREE AND A HARD PLACE: PUBLIC INVOLVEMENT IN SEWER SYSTEM PLANNING
Abstract
The Orange Water and Sewer Authority (OWASA) is the water and sewer service provider for the areas of Chapel Hill and Carrboro, North Carolina. In the heart of Chapel Hill lies the University of North Carolina-Chapel Hill (UNC-CH) also serviced by OWASA through parallel 18-inch sewer mains referred to as the Meeting of the Waters Interceptor (MWI). These pipelines dating back to the 1940s were laid adjacent to the Meeting of the Waters Creek and continued downstream to the Mason Farm Wastewater Treatment Plant (WWTP). The MWI travels along the edge of a large property that was subsequently set aside by its owner, William Coker, for the University and made part of the North Carolina Botanical Garden (NCBG). This land was called the Coker Pinetum and is a valued part of the University's plan for protecting forested areas and significant trees. Downstream of the Coker Pinetum, the MWI runs along small local roads and then adjacent to the northern edge of the main NCBG property to the WWTP.Through recent master planning efforts for OWASA and UNC-CH, the existing 18-inch pipes of the MWI were identified as having insufficient capacity to convey future peak flows as the University continues its 1 billion expansion. Initial study recommendations suggested that replacing the aging clay pipes with a new single 36-inch ductile iron pipe would address the capacity issue. At the same time, OWASA was implementing a project to supply reclaimed water from the WWTP back to the UNC-CH campus for use in a variety of applications through a new 24-inch pressurized reclaimed water transmission main. These two projects would likely follow a similar route from the campus to the WWTP.Review of the natural topography of the area showed that the existing route along the Coker Pinetum was the only available corridor to allow gravity flow. OWASA staff presented the project to the local community in a public meeting to inform them of the issues and gather input. The NCBG staff and local residents, many who take personal interest in their adjacent forest, were concerned about the impact to the trees, creek, and disruption to the local roads of the adjoining neighborhoods. OWASA staff used the public input and implemented an Alternative Evaluation Project. Brown and Caldwell was retained to investigate various project alternatives (including construction of a new pump station to avoid piping through the Coker Pinetum area) using a Pairwise Comparison process. After developing a life-cycle cost analysis, investigating existing easements, preparing a thorough tree survey, and identifying pump station site requirements, the results were presented to the community.Using a thorough evaluation process and continuous communication with the local stakeholders, a project consensus was developed that OWASA is optimistic can be carried successfully through construction. This paper will review the decision-making and public involvement process and describe the challenges and accomplishments of the project.
The Orange Water and Sewer Authority (OWASA) is the water and sewer service provider for the areas of Chapel Hill and Carrboro, North Carolina. In the heart of Chapel Hill lies the University of North Carolina-Chapel Hill (UNC-CH) also serviced by OWASA through parallel 18-inch sewer mains referred to as the Meeting of the Waters Interceptor (MWI). These pipelines dating back to the 1940s were...
Author(s)
Christopher D. WilsonAlexandra Jones
SourceProceedings of the Water Environment Federation
SubjectSession 11: Gaining Support from your Most Important Customers-the Public
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2007
ISSN1938-6478
SICI1938-6478(20070101)2007:4L.735;1-
DOI10.2175/193864707787975174
Volume / Issue2007 / 4
Content sourceCollection Systems Conference
First / last page(s)735 - 745
Copyright2007
Word count486

Actions, changes & tasks

Outstanding Actions

Add action for paragraph

Current Changes

Add signficant change

Current Tasks

Add risk task

Connect with us

Follow us on Facebook
Follow us on Twitter
Connect to us on LinkedIn
Subscribe on YouTube
Powered by Librios Ltd
Powered by Librios Ltd
Authors
Terms of Use
Policies
Help
Accessibility
Contact us
Copyright © 2024 by the Water Environment Federation
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: WWTF Digital Boot 180x150
WWTF Digital (180x150)
Created on Jul 02
Websitehttps:/­/­www.wef.org/­wwtf?utm_medium=WWTF&utm_source=AccessWater&utm_campaign=WWTF
180x150
Christopher D. Wilson# Alexandra Jones. BETWEEN A TREE AND A HARD PLACE: PUBLIC INVOLVEMENT IN SEWER SYSTEM PLANNING. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Web. 26 Aug. 2025. <https://www.accesswater.org?id=-294541CITANCHOR>.
Christopher D. Wilson# Alexandra Jones. BETWEEN A TREE AND A HARD PLACE: PUBLIC INVOLVEMENT IN SEWER SYSTEM PLANNING. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Accessed August 26, 2025. https://www.accesswater.org/?id=-294541CITANCHOR.
Christopher D. Wilson# Alexandra Jones
BETWEEN A TREE AND A HARD PLACE: PUBLIC INVOLVEMENT IN SEWER SYSTEM PLANNING
Access Water
Water Environment Federation
December 22, 2018
August 26, 2025
https://www.accesswater.org/?id=-294541CITANCHOR