lastID = -295345
Skip to main content Skip to top navigation Skip to site search
Top of page
  • My citations options
    Web Back (from Web)
    Chicago Back (from Chicago)
    MLA Back (from MLA)
Close action menu

You need to login to use this feature.

Please wait a moment…
Please wait while we update your results...
Please wait a moment...
Description: Access Water
Context Menu
Description: Book cover
Henderson's New Membrane Bioreactor Water Reclamation Facility – Choosing and Applying the Control System Architecture
  • Browse
  • Compilations
    • Compilations list
  • Subscriptions
Tools

Related contents

Loading related content

Workflow

No linked records yet

X
  • Current: 2022-06-14 20:16:03 Adam Phillips
  • 2022-06-14 20:16:02 Adam Phillips
  • 2020-03-26 23:28:33 Adam Phillips
  • 2020-01-31 23:49:42 Administrator
  • 2020-01-31 23:49:41 Administrator
Description: Access Water
  • Browse
  • Compilations
  • Subscriptions
Log in
0
Accessibility Options

Base text size -

This is a sample piece of body text
Larger
Smaller
  • Shopping basket (0)
  • Accessibility options
  • Return to previous
Description: Book cover
Henderson's New Membrane Bioreactor Water Reclamation Facility – Choosing and Applying the Control System Architecture

Henderson's New Membrane Bioreactor Water Reclamation Facility – Choosing and Applying the Control System Architecture

Henderson's New Membrane Bioreactor Water Reclamation Facility – Choosing and Applying the Control System Architecture

  • New
  • View
  • Details
  • Reader
  • Default
  • Share
  • Email
  • Facebook
  • Twitter
  • LinkedIn
  • New
  • View
  • Default view
  • Reader view
  • Data view
  • Details

This page cannot be printed from here

Please use the dedicated print option from the 'view' drop down menu located in the blue ribbon in the top, right section of the publication.

screenshot of print menu option

Description: Book cover
Henderson's New Membrane Bioreactor Water Reclamation Facility – Choosing and Applying the Control System Architecture
Abstract
The City of Henderson, Nevada is planning a new water reclamation facility that will serve the needs of its growing population. For this new satellite 8 million gallon per day (mgd) water reclamation facility, a membrane bioreactor (MBR) treatment alternative was selected. The configuration and operation of MBR facilities require careful selection of the control system architecture, including integration of the membrane equipment supplier controls with overall treatment plant processes, key data emulation methods, and a high reliability and redundancy configuration.The system configuration has been based on MBR control system experience and was integrated into the procurement documents for the membrane equipment supplier, including requirements for support in the control system data emulation and integration throughout the plant control system.The main concepts for the control system architecture are:Programmable Logic Controller (PLC) System DesignOperator Interface Modules for Monitoring and ControlNetwork Communications System DesignAlarm and Response ManagementStandby PowerThis type of 5th generation MBR system requires multiple PLCs, and the configuration of the PLCs, I/Os, and control logic within each is important. The design includes redundant master PLCs as well as train PLCs, with the coordinating logic and control of utility services (air supply, chemical feed) resident in the masters while each train PLC acts as a slave and provides control of one or more individual trains of equipment.Network communications between PLCs and with peripheral devices such as Operator Interfaces and plant SCADA systems must be maintained, since the master PLC must be able to initiate and coordinate certain train PLC events such as backpulsing, relax, flow setpoint adjustment, and recovery clean events. Fully looped redundant communications networks are required to ensure that there cannot be a single point of failure that would disrupt communications between the master and train PLCs.
The City of Henderson, Nevada is planning a new water reclamation facility that will serve the needs of its growing population. For this new satellite 8 million gallon per day (mgd) water reclamation facility, a membrane bioreactor (MBR) treatment alternative was selected. The configuration and operation of MBR facilities require careful selection of the control system architecture, including...
Author(s)
J. OkazakiM. MornieA. EdwardsD. FritzJ. HoyleR. BrauerJ. SmithD. Brunkow
SourceProceedings of the Water Environment Federation
SubjectSession 5: Learning from MBR Installations: Controls, Phosphorus Removal, Retrofits, and Small Systems
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2008
ISSN1938-6478
SICI1938-6478(20080101)2008:1L.290;1-
DOI10.2175/193864708788803361
Volume / Issue2008 / 1
Content sourceMembranes Conference
First / last page(s)290 - 301
Copyright2008
Word count308

Purchase price $11.50

Get access
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'Henderson's New Membrane Bioreactor Water Reclamation Facility – Choosing and Applying the Control System Architecture'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: Book cover
Henderson's New Membrane Bioreactor Water Reclamation Facility – Choosing and Applying the Control System Architecture
Pricing
Non-member price: $11.50
Member price:
-295345
Get access
-295345
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'Henderson's New Membrane Bioreactor Water Reclamation Facility – Choosing and Applying the Control System Architecture'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.

Details

Description: Book cover
Henderson's New Membrane Bioreactor Water Reclamation Facility – Choosing and Applying the Control System Architecture
Abstract
The City of Henderson, Nevada is planning a new water reclamation facility that will serve the needs of its growing population. For this new satellite 8 million gallon per day (mgd) water reclamation facility, a membrane bioreactor (MBR) treatment alternative was selected. The configuration and operation of MBR facilities require careful selection of the control system architecture, including integration of the membrane equipment supplier controls with overall treatment plant processes, key data emulation methods, and a high reliability and redundancy configuration.The system configuration has been based on MBR control system experience and was integrated into the procurement documents for the membrane equipment supplier, including requirements for support in the control system data emulation and integration throughout the plant control system.The main concepts for the control system architecture are:Programmable Logic Controller (PLC) System DesignOperator Interface Modules for Monitoring and ControlNetwork Communications System DesignAlarm and Response ManagementStandby PowerThis type of 5th generation MBR system requires multiple PLCs, and the configuration of the PLCs, I/Os, and control logic within each is important. The design includes redundant master PLCs as well as train PLCs, with the coordinating logic and control of utility services (air supply, chemical feed) resident in the masters while each train PLC acts as a slave and provides control of one or more individual trains of equipment.Network communications between PLCs and with peripheral devices such as Operator Interfaces and plant SCADA systems must be maintained, since the master PLC must be able to initiate and coordinate certain train PLC events such as backpulsing, relax, flow setpoint adjustment, and recovery clean events. Fully looped redundant communications networks are required to ensure that there cannot be a single point of failure that would disrupt communications between the master and train PLCs.
The City of Henderson, Nevada is planning a new water reclamation facility that will serve the needs of its growing population. For this new satellite 8 million gallon per day (mgd) water reclamation facility, a membrane bioreactor (MBR) treatment alternative was selected. The configuration and operation of MBR facilities require careful selection of the control system architecture, including...
Author(s)
J. OkazakiM. MornieA. EdwardsD. FritzJ. HoyleR. BrauerJ. SmithD. Brunkow
SourceProceedings of the Water Environment Federation
SubjectSession 5: Learning from MBR Installations: Controls, Phosphorus Removal, Retrofits, and Small Systems
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2008
ISSN1938-6478
SICI1938-6478(20080101)2008:1L.290;1-
DOI10.2175/193864708788803361
Volume / Issue2008 / 1
Content sourceMembranes Conference
First / last page(s)290 - 301
Copyright2008
Word count308

Actions, changes & tasks

Outstanding Actions

Add action for paragraph

Current Changes

Add signficant change

Current Tasks

Add risk task

Connect with us

Follow us on Facebook
Follow us on Twitter
Connect to us on LinkedIn
Subscribe on YouTube
Powered by Librios Ltd
Powered by Librios Ltd
Authors
Terms of Use
Policies
Help
Accessibility
Contact us
Copyright © 2024 by the Water Environment Federation
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: WWTF Digital Boot 180x150
WWTF Digital (180x150)
Created on Jul 02
Websitehttps:/­/­www.wef.org/­wwtf?utm_medium=WWTF&utm_source=AccessWater&utm_campaign=WWTF
180x150
J. Okazaki# M. Mornie# A. Edwards# D. Fritz# J. Hoyle# R. Brauer# J. Smith# D. Brunkow. Henderson's New Membrane Bioreactor Water Reclamation Facility – Choosing and Applying the Control System Architecture. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Web. 21 Jun. 2025. <https://www.accesswater.org?id=-295345CITANCHOR>.
J. Okazaki# M. Mornie# A. Edwards# D. Fritz# J. Hoyle# R. Brauer# J. Smith# D. Brunkow. Henderson's New Membrane Bioreactor Water Reclamation Facility – Choosing and Applying the Control System Architecture. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Accessed June 21, 2025. https://www.accesswater.org/?id=-295345CITANCHOR.
J. Okazaki# M. Mornie# A. Edwards# D. Fritz# J. Hoyle# R. Brauer# J. Smith# D. Brunkow
Henderson's New Membrane Bioreactor Water Reclamation Facility – Choosing and Applying the Control System Architecture
Access Water
Water Environment Federation
December 22, 2018
June 21, 2025
https://www.accesswater.org/?id=-295345CITANCHOR