lastID = -295434
Skip to main content Skip to top navigation Skip to site search
Top of page
  • My citations options
    Web Back (from Web)
    Chicago Back (from Chicago)
    MLA Back (from MLA)
Close action menu

You need to login to use this feature.

Please wait a moment…
Please wait while we update your results...
Please wait a moment...
Description: Access Water
Context Menu
Description: Book cover
Dallas Water Utilities: A Risk-Based Approach to Asset Renewal
  • Browse
  • Compilations
    • Compilations list
  • Subscriptions
Tools

Related contents

Loading related content

Workflow

No linked records yet

X
  • Current: 2022-05-06 20:04:23 Adam Phillips
  • 2022-05-06 20:04:22 Adam Phillips
  • 2020-03-27 02:09:49 Adam Phillips
  • 2020-03-27 02:09:48 Adam Phillips
  • 2020-01-31 21:36:26 Administrator
  • 2020-01-31 21:36:25 Administrator
  • 2020-01-31 21:36:24 Administrator
Description: Access Water
  • Browse
  • Compilations
  • Subscriptions
Log in
0
Accessibility Options

Base text size -

This is a sample piece of body text
Larger
Smaller
  • Shopping basket (0)
  • Accessibility options
  • Return to previous
Description: Book cover
Dallas Water Utilities: A Risk-Based Approach to Asset Renewal

Dallas Water Utilities: A Risk-Based Approach to Asset Renewal

Dallas Water Utilities: A Risk-Based Approach to Asset Renewal

  • New
  • View
  • Details
  • Reader
  • Default
  • Share
  • Email
  • Facebook
  • Twitter
  • LinkedIn
  • New
  • View
  • Default view
  • Reader view
  • Data view
  • Details

This page cannot be printed from here

Please use the dedicated print option from the 'view' drop down menu located in the blue ribbon in the top, right section of the publication.

screenshot of print menu option

Description: Book cover
Dallas Water Utilities: A Risk-Based Approach to Asset Renewal
Abstract
As part of a comprehensive wastewater master planning effort, Dallas Water Utilities (DWU) has taken a proactive step towards risk-based management and renewal of its collection system infrastructure. A recently completed Asset Inspection and Renewal Strategy included the development of “first-cut” risk scores based on an assessment of the condition of the existing assets and the expected impact of any potential structural failure (criticality) of these assets. Risk scores were developed for over 100,000 individual assets in the 4,000-mile collection system. These risk scores were then used to target near-term inspection priorities and develop a 50-year forecast of renewal needs in the collection system.The forecasted renewal needs were then integrated with a capacity-based risk analysis that was developed based on hydraulic modeling results also performed as part of the master planning effort. The result was a risk based capital improvement program that integrated structural and capacity-based risks to prioritize capital needs for the service area.This project has positioned the City to manage its collection system assets according to risk, including targeting near-term inspection strategies and forecasting long-term expenditures over the next 50 years. Benefits of this effort to the City include:Improved ability to forecast future renewal costsProactive resource and budget planningProactive strategy for managing capacity and structural risksEffective tool for communicating collection system risks to City decision makersFramework for alignment of daily O&M staff inspection activities with City's risk management policiesRoadmap for more effective data utilization and improved CIP project prioritizationThis presentation will cover the rationale, challenges and benefits of utilizing a risk-based approach to asset renewal.
As part of a comprehensive wastewater master planning effort, Dallas Water Utilities (DWU) has taken a proactive step towards risk-based management and renewal of its collection system infrastructure. A recently completed Asset Inspection and Renewal Strategy included the development of “first-cut” risk scores based on an assessment of the condition of the existing assets and the...
Author(s)
Simon HeartMarc CottingameJane McLamarrah
SourceProceedings of the Water Environment Federation
SubjectSession 15: Risky Business
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2008
ISSN1938-6478
SICI1938-6478(20080101)2008:2L.426;1-
DOI10.2175/193864708788805963
Volume / Issue2008 / 2
Content sourceUtility Management Conference
First / last page(s)426 - 439
Copyright2008
Word count273

Purchase price $11.50

Get access
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'Dallas Water Utilities: A Risk-Based Approach to Asset Renewal'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: Book cover
Dallas Water Utilities: A Risk-Based Approach to Asset Renewal
Pricing
Non-member price: $11.50
Member price:
-295434
Get access
-295434
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'Dallas Water Utilities: A Risk-Based Approach to Asset Renewal'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.

Details

Description: Book cover
Dallas Water Utilities: A Risk-Based Approach to Asset Renewal
Abstract
As part of a comprehensive wastewater master planning effort, Dallas Water Utilities (DWU) has taken a proactive step towards risk-based management and renewal of its collection system infrastructure. A recently completed Asset Inspection and Renewal Strategy included the development of “first-cut” risk scores based on an assessment of the condition of the existing assets and the expected impact of any potential structural failure (criticality) of these assets. Risk scores were developed for over 100,000 individual assets in the 4,000-mile collection system. These risk scores were then used to target near-term inspection priorities and develop a 50-year forecast of renewal needs in the collection system.The forecasted renewal needs were then integrated with a capacity-based risk analysis that was developed based on hydraulic modeling results also performed as part of the master planning effort. The result was a risk based capital improvement program that integrated structural and capacity-based risks to prioritize capital needs for the service area.This project has positioned the City to manage its collection system assets according to risk, including targeting near-term inspection strategies and forecasting long-term expenditures over the next 50 years. Benefits of this effort to the City include:Improved ability to forecast future renewal costsProactive resource and budget planningProactive strategy for managing capacity and structural risksEffective tool for communicating collection system risks to City decision makersFramework for alignment of daily O&M staff inspection activities with City's risk management policiesRoadmap for more effective data utilization and improved CIP project prioritizationThis presentation will cover the rationale, challenges and benefits of utilizing a risk-based approach to asset renewal.
As part of a comprehensive wastewater master planning effort, Dallas Water Utilities (DWU) has taken a proactive step towards risk-based management and renewal of its collection system infrastructure. A recently completed Asset Inspection and Renewal Strategy included the development of “first-cut” risk scores based on an assessment of the condition of the existing assets and the...
Author(s)
Simon HeartMarc CottingameJane McLamarrah
SourceProceedings of the Water Environment Federation
SubjectSession 15: Risky Business
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2008
ISSN1938-6478
SICI1938-6478(20080101)2008:2L.426;1-
DOI10.2175/193864708788805963
Volume / Issue2008 / 2
Content sourceUtility Management Conference
First / last page(s)426 - 439
Copyright2008
Word count273

Actions, changes & tasks

Outstanding Actions

Add action for paragraph

Current Changes

Add signficant change

Current Tasks

Add risk task

Connect with us

Follow us on Facebook
Follow us on Twitter
Connect to us on LinkedIn
Subscribe on YouTube
Powered by Librios Ltd
Powered by Librios Ltd
Authors
Terms of Use
Policies
Help
Accessibility
Contact us
Copyright © 2024 by the Water Environment Federation
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: WWTF Digital Boot 180x150
WWTF Digital (180x150)
Created on Jul 02
Websitehttps:/­/­www.wef.org/­wwtf?utm_medium=WWTF&utm_source=AccessWater&utm_campaign=WWTF
180x150
Simon Heart# Marc Cottingame# Jane McLamarrah. Dallas Water Utilities: A Risk-Based Approach to Asset Renewal. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Web. 4 Jul. 2025. <https://www.accesswater.org?id=-295434CITANCHOR>.
Simon Heart# Marc Cottingame# Jane McLamarrah. Dallas Water Utilities: A Risk-Based Approach to Asset Renewal. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Accessed July 4, 2025. https://www.accesswater.org/?id=-295434CITANCHOR.
Simon Heart# Marc Cottingame# Jane McLamarrah
Dallas Water Utilities: A Risk-Based Approach to Asset Renewal
Access Water
Water Environment Federation
December 22, 2018
July 4, 2025
https://www.accesswater.org/?id=-295434CITANCHOR