Combined Sewer Overflow Conveyance and Storage with Electrical Power Transmission: Together is Better?
  • Browse
  • Compilations
    • Compilations list
  • Subscriptions
Tools

Related contents

Loading related content

Workflow

No linked records yet

X
  • Current: 2022-05-04 21:17:39 Adam Phillips
  • 2022-05-04 21:17:38 Adam Phillips
  • 2020-03-26 22:07:32 Adam Phillips
  • 2020-03-26 22:07:31 Adam Phillips
  • 2020-01-31 21:06:43 Administrator
  • 2020-01-31 21:06:42 Administrator
Description: Access Water
  • Browse
  • Compilations
  • Subscriptions
Log in
0
Accessibility Options

Base text size -

This is a sample piece of body text
Larger
Smaller
  • Shopping basket (0)
  • Accessibility options
  • Return to previous
Description: Book cover
Combined Sewer Overflow Conveyance and Storage with Electrical Power Transmission: Together is Better?

Combined Sewer Overflow Conveyance and Storage with Electrical Power Transmission: Together is Better?

Combined Sewer Overflow Conveyance and Storage with Electrical Power Transmission: Together is Better?

  • New
  • View
  • Details
  • Reader
  • Default
  • Share
  • Email
  • Facebook
  • Twitter
  • LinkedIn
  • New
  • View
  • Default view
  • Reader view
  • Data view
  • Details

This page cannot be printed from here

Please use the dedicated print option from the 'view' drop down menu located in the blue ribbon in the top, right section of the publication.

screenshot of print menu option

Description: Book cover
Combined Sewer Overflow Conveyance and Storage with Electrical Power Transmission: Together is Better?
Abstract
The City of Seattle's Public Utilities (SPU), looking for a cost-effective means to reduce combined sewer overflows (CSO's) in the downtown central business district, developed a plan to use a proposed electrical power transmission and distribution tunnel and construction shaft for combined sewage conveyance and storage. The power transmission tunnel initially was conceived to meet Seattle City Light's (SCL) need to replace and relocate major power transmission lines within Seattle's congested central business district. A deep bored tunnel would be constructed to avoid major traffic impacts, utility congestion, and poor soils. The tunnel would have an 11-foot inside diameter, be 4,000 feet long, and 65 to 85 feet deep. A tunnel boring machine (TBM) launch shaft would be a minimum of 60 feet in diameter. The receiving shaft would be no smaller than 20 feet square and 65 feet deep. Both shafts would be furnished with stairs and house emergency life safety equipment. Power transmission cables would be brought in and out of the tunnel through the shafts and hung on the tunnel wallsBuilding on knowledge accumulated from operational history of CSO storage facilities in the Pacific Northwest, a conceptual design was developed incorporating combined sewage conveyance and storage into the tunnel project that resulted in beneficial cost sharing of the facilities. From this design, engineers and utility managers have learned how flexible, creative engineering can provide cost-effective solutions.The proposed combined sewer modifications include the following major components:High flow diversion structure including coarse screens and a grit chamberDrop structure and pigging station using space within the tunnel north access shaftTwo 20-inch-diameter conveyance pipes using space below the tunnel floor1.4 million gallons of combined sewage storage (by converting the TBM launch shaft into a storage tank)Odor controlPumped discharge from the storage tank to the collection system using removable submersible pumpsDesign challenges that were solved include:SCL required that SPU's sewer maintenance personnel have no potential for access to the electrical transmission cables.Sewer maintenance personnel required assurance that the tunnel CSO pipes would not plug.The pipes entered the bottom of the storage tank and would flow under available gravity pressure; as a result, flushing velocities could not be achieved during most CSO flow conditions.The team needed to develop a method to easily maintain and clean the deep storage tank after a CSO flow event. SPU's sewer maintenance personnel are not currently trained in maintenance of a deep structure.These significant challenges, and others, were solved. The conceptual design resulted in a practical and feasible solution for both SCL and SPU.
The City of Seattle's Public Utilities (SPU), looking for a cost-effective means to reduce combined sewer overflows (CSO's) in the downtown central business district, developed a plan to use a proposed electrical power transmission and distribution tunnel and construction shaft for combined sewage conveyance and storage. The power transmission tunnel initially was conceived to meet Seattle City...
Author(s)
Vicki SironenBrian HemphillGrover Jones
SourceProceedings of the Water Environment Federation
SubjectSession 11 - Planning Pays Off
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2009
ISSN1938-6478
SICI1938-6478(20090101)2009:2L.722;1-
DOI10.2175/193864709793847267
Volume / Issue2009 / 2
Content sourceCollection Systems Conference
First / last page(s)722 - 733
Copyright2009
Word count441
Subject keywordsCSOTBMtunnelcombined sewer overflowstorageconveyance

Purchase price $11.50

Get access
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'Combined Sewer Overflow Conveyance and Storage with Electrical Power Transmission: Together is Better?'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: Book cover
Combined Sewer Overflow Conveyance and Storage with Electrical Power Transmission: Together is Better?
Pricing
Non-member price: $11.50
Member price:
-296612
Get access
-296612
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'Combined Sewer Overflow Conveyance and Storage with Electrical Power Transmission: Together is Better?'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.

Details

Description: Book cover
Combined Sewer Overflow Conveyance and Storage with Electrical Power Transmission: Together is Better?
Abstract
The City of Seattle's Public Utilities (SPU), looking for a cost-effective means to reduce combined sewer overflows (CSO's) in the downtown central business district, developed a plan to use a proposed electrical power transmission and distribution tunnel and construction shaft for combined sewage conveyance and storage. The power transmission tunnel initially was conceived to meet Seattle City Light's (SCL) need to replace and relocate major power transmission lines within Seattle's congested central business district. A deep bored tunnel would be constructed to avoid major traffic impacts, utility congestion, and poor soils. The tunnel would have an 11-foot inside diameter, be 4,000 feet long, and 65 to 85 feet deep. A tunnel boring machine (TBM) launch shaft would be a minimum of 60 feet in diameter. The receiving shaft would be no smaller than 20 feet square and 65 feet deep. Both shafts would be furnished with stairs and house emergency life safety equipment. Power transmission cables would be brought in and out of the tunnel through the shafts and hung on the tunnel wallsBuilding on knowledge accumulated from operational history of CSO storage facilities in the Pacific Northwest, a conceptual design was developed incorporating combined sewage conveyance and storage into the tunnel project that resulted in beneficial cost sharing of the facilities. From this design, engineers and utility managers have learned how flexible, creative engineering can provide cost-effective solutions.The proposed combined sewer modifications include the following major components:High flow diversion structure including coarse screens and a grit chamberDrop structure and pigging station using space within the tunnel north access shaftTwo 20-inch-diameter conveyance pipes using space below the tunnel floor1.4 million gallons of combined sewage storage (by converting the TBM launch shaft into a storage tank)Odor controlPumped discharge from the storage tank to the collection system using removable submersible pumpsDesign challenges that were solved include:SCL required that SPU's sewer maintenance personnel have no potential for access to the electrical transmission cables.Sewer maintenance personnel required assurance that the tunnel CSO pipes would not plug.The pipes entered the bottom of the storage tank and would flow under available gravity pressure; as a result, flushing velocities could not be achieved during most CSO flow conditions.The team needed to develop a method to easily maintain and clean the deep storage tank after a CSO flow event. SPU's sewer maintenance personnel are not currently trained in maintenance of a deep structure.These significant challenges, and others, were solved. The conceptual design resulted in a practical and feasible solution for both SCL and SPU.
The City of Seattle's Public Utilities (SPU), looking for a cost-effective means to reduce combined sewer overflows (CSO's) in the downtown central business district, developed a plan to use a proposed electrical power transmission and distribution tunnel and construction shaft for combined sewage conveyance and storage. The power transmission tunnel initially was conceived to meet Seattle City...
Author(s)
Vicki SironenBrian HemphillGrover Jones
SourceProceedings of the Water Environment Federation
SubjectSession 11 - Planning Pays Off
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2009
ISSN1938-6478
SICI1938-6478(20090101)2009:2L.722;1-
DOI10.2175/193864709793847267
Volume / Issue2009 / 2
Content sourceCollection Systems Conference
First / last page(s)722 - 733
Copyright2009
Word count441
Subject keywordsCSOTBMtunnelcombined sewer overflowstorageconveyance

Actions, changes & tasks

Outstanding Actions

Add action for paragraph

Current Changes

Add signficant change

Current Tasks

Add risk task

Connect with us

Follow us on Facebook
Follow us on Twitter
Connect to us on LinkedIn
Subscribe on YouTube
Powered by Librios Ltd
Powered by Librios Ltd
Authors
Terms of Use
Policies
Help
Accessibility
Contact us
Copyright © 2024 by the Water Environment Federation
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: WWTF Digital Boot 180x150
WWTF Digital (180x150)
Created on Jul 02
Websitehttps:/­/­www.wef.org/­wwtf?utm_medium=WWTF&utm_source=AccessWater&utm_campaign=WWTF
180x150
Vicki Sironen# Brian Hemphill# Grover Jones. Combined Sewer Overflow Conveyance and Storage with Electrical Power Transmission: Together is Better?. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Web. 8 Jun. 2025. <https://www.accesswater.org?id=-296612CITANCHOR>.
Vicki Sironen# Brian Hemphill# Grover Jones. Combined Sewer Overflow Conveyance and Storage with Electrical Power Transmission: Together is Better?. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Accessed June 8, 2025. https://www.accesswater.org/?id=-296612CITANCHOR.
Vicki Sironen# Brian Hemphill# Grover Jones
Combined Sewer Overflow Conveyance and Storage with Electrical Power Transmission: Together is Better?
Access Water
Water Environment Federation
December 22, 2018
June 8, 2025
https://www.accesswater.org/?id=-296612CITANCHOR