lastID = -298672
Skip to main content Skip to top navigation Skip to site search
Top of page
  • My citations options
    Web Back (from Web)
    Chicago Back (from Chicago)
    MLA Back (from MLA)
Close action menu

You need to login to use this feature.

Please wait a moment…
Please wait while we update your results...
Please wait a moment...
Description: Access Water
Context Menu
Description: Book cover
Ten Years of Operational Experience on HRC for Remote CSO System
  • Browse
  • Compilations
    • Compilations list
  • Subscriptions
Tools

Related contents

Loading related content

Workflow

No linked records yet

X
  • Current: 2022-05-04 20:04:45 Adam Phillips
  • 2022-05-04 20:04:44 Adam Phillips
  • 2020-02-01 04:51:15 Administrator
  • 2020-02-01 04:51:14 Administrator
Description: Access Water
  • Browse
  • Compilations
  • Subscriptions
Log in
0
Accessibility Options

Base text size -

This is a sample piece of body text
Larger
Smaller
  • Shopping basket (0)
  • Accessibility options
  • Return to previous
Description: Book cover
Ten Years of Operational Experience on HRC for Remote CSO System

Ten Years of Operational Experience on HRC for Remote CSO System

Ten Years of Operational Experience on HRC for Remote CSO System

  • New
  • View
  • Details
  • Reader
  • Default
  • Share
  • Email
  • Facebook
  • Twitter
  • LinkedIn
  • New
  • View
  • Default view
  • Reader view
  • Data view
  • Details

This page cannot be printed from here

Please use the dedicated print option from the 'view' drop down menu located in the blue ribbon in the top, right section of the publication.

screenshot of print menu option

Description: Book cover
Ten Years of Operational Experience on HRC for Remote CSO System
Abstract
The city of Bremerton, Washington had been considering the use of a high rate clarification (HRC) process to treat wet weather induced flows to reduce combined sewer overflows (CSO). In December of 1999, HRC pilot testing was conducted at the Bremerton West Side Wastewater Treatment Plant (West Side) with a trailer-mounted pilot unit to test its effectiveness. The HRC pilot testing demonstrated that a high quality effluent could be produced even during variable influent loading conditions at constant overflow rates of 2,310 liters per day per square meter, lpm/m2 (55 gallons per minute per square foot, gpm/ft2). In 2001, construction was started on a 75.7 million liters a day, MLD (20 million-gallon a day, MGD) Actiflo® facility to treat wet weather induced flows, with the East Side Treatment Plant (East Side) scheduled to become operational in late 2001. The HRC approach saved Bremerton in excess of 30 million compared to traditional treatment plant expansion and conveyance and allowed for a fast tracked construction schedule to meet a consent decree imposed deadline.East Side was the first and is one of only a few satellite treatment facilities in the United States that is designed solely to treat CSOs using the HRC process. This paper reports on the operational history of the HRC limited use CSO treatment facility and the unique challenges this entails.
The city of Bremerton, Washington had been considering the use of a high rate clarification (HRC) process to treat wet weather induced flows to reduce combined sewer overflows (CSO). In December of 1999, HRC pilot testing was conducted at the Bremerton West Side Wastewater Treatment Plant (West Side) with a trailer-mounted pilot unit to test its effectiveness. The HRC pilot testing demonstrated...
Author(s)
James Matt CrowPat Coxon
SourceProceedings of the Water Environment Federation
SubjectSession 9: Operations Challenges and Solutions: Nitrogen Removal and Beyond
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2011
ISSN1938-6478
SICI1938-6478(20110101)2011:18L.400;1-
DOI10.2175/193864711802639390
Volume / Issue2011 / 18
Content sourceWEFTEC
First / last page(s)400 - 417
Copyright2011
Word count232
Subject keywordsCSOshigh-rate clarificationActiflo®cost savingssmall footprintlimited use facility

Purchase price $11.50

Get access
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'Ten Years of Operational Experience on HRC for Remote CSO System'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: Book cover
Ten Years of Operational Experience on HRC for Remote CSO System
Pricing
Non-member price: $11.50
Member price:
-298672
Get access
-298672
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'Ten Years of Operational Experience on HRC for Remote CSO System'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.

Details

Description: Book cover
Ten Years of Operational Experience on HRC for Remote CSO System
Abstract
The city of Bremerton, Washington had been considering the use of a high rate clarification (HRC) process to treat wet weather induced flows to reduce combined sewer overflows (CSO). In December of 1999, HRC pilot testing was conducted at the Bremerton West Side Wastewater Treatment Plant (West Side) with a trailer-mounted pilot unit to test its effectiveness. The HRC pilot testing demonstrated that a high quality effluent could be produced even during variable influent loading conditions at constant overflow rates of 2,310 liters per day per square meter, lpm/m2 (55 gallons per minute per square foot, gpm/ft2). In 2001, construction was started on a 75.7 million liters a day, MLD (20 million-gallon a day, MGD) Actiflo® facility to treat wet weather induced flows, with the East Side Treatment Plant (East Side) scheduled to become operational in late 2001. The HRC approach saved Bremerton in excess of 30 million compared to traditional treatment plant expansion and conveyance and allowed for a fast tracked construction schedule to meet a consent decree imposed deadline.East Side was the first and is one of only a few satellite treatment facilities in the United States that is designed solely to treat CSOs using the HRC process. This paper reports on the operational history of the HRC limited use CSO treatment facility and the unique challenges this entails.
The city of Bremerton, Washington had been considering the use of a high rate clarification (HRC) process to treat wet weather induced flows to reduce combined sewer overflows (CSO). In December of 1999, HRC pilot testing was conducted at the Bremerton West Side Wastewater Treatment Plant (West Side) with a trailer-mounted pilot unit to test its effectiveness. The HRC pilot testing demonstrated...
Author(s)
James Matt CrowPat Coxon
SourceProceedings of the Water Environment Federation
SubjectSession 9: Operations Challenges and Solutions: Nitrogen Removal and Beyond
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2011
ISSN1938-6478
SICI1938-6478(20110101)2011:18L.400;1-
DOI10.2175/193864711802639390
Volume / Issue2011 / 18
Content sourceWEFTEC
First / last page(s)400 - 417
Copyright2011
Word count232
Subject keywordsCSOshigh-rate clarificationActiflo®cost savingssmall footprintlimited use facility

Actions, changes & tasks

Outstanding Actions

Add action for paragraph

Current Changes

Add signficant change

Current Tasks

Add risk task

Connect with us

Follow us on Facebook
Follow us on Twitter
Connect to us on LinkedIn
Subscribe on YouTube
Powered by Librios Ltd
Powered by Librios Ltd
Authors
Terms of Use
Policies
Help
Accessibility
Contact us
Copyright © 2024 by the Water Environment Federation
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: WWTF Digital Boot 180x150
WWTF Digital (180x150)
Created on Jul 02
Websitehttps:/­/­www.wef.org/­wwtf?utm_medium=WWTF&utm_source=AccessWater&utm_campaign=WWTF
180x150
James Matt Crow# Pat Coxon. Ten Years of Operational Experience on HRC for Remote CSO System. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Web. 6 Jun. 2025. <https://www.accesswater.org?id=-298672CITANCHOR>.
James Matt Crow# Pat Coxon. Ten Years of Operational Experience on HRC for Remote CSO System. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Accessed June 6, 2025. https://www.accesswater.org/?id=-298672CITANCHOR.
James Matt Crow# Pat Coxon
Ten Years of Operational Experience on HRC for Remote CSO System
Access Water
Water Environment Federation
December 22, 2018
June 6, 2025
https://www.accesswater.org/?id=-298672CITANCHOR