lastID = -299533
Skip to main content Skip to top navigation Skip to site search
Top of page
  • My citations options
    Web Back (from Web)
    Chicago Back (from Chicago)
    MLA Back (from MLA)
Close action menu

You need to login to use this feature.

Please wait a moment…
Please wait while we update your results...
Please wait a moment...
Description: Access Water
Context Menu
Description: Trenchless Technologies Conquer Design, Planning, and Construction Challenges on a...
Trenchless Technologies Conquer Design, Planning, and Construction Challenges on a Washington, D.C. Area Conveyance Project
  • Browse
  • Compilations
    • Compilations list
  • Subscriptions
Tools

Related contents

Loading related content

Workflow

No linked records yet

X
  • Current: 2022-05-06 11:17:58 Adam Phillips
  • 2022-05-06 11:17:57 Adam Phillips
  • 2020-03-31 00:38:15 Adam Phillips
  • 2020-03-31 00:38:14 Adam Phillips
  • 2020-03-27 18:16:41 Katherine Saltzman
  • 2020-03-27 18:16:40 Katherine Saltzman
  • 2020-02-23 15:32:51 Adam Phillips
  • 2020-02-23 15:32:50 Adam Phillips
  • 2020-02-01 05:51:14 Administrator
  • 2020-02-01 05:51:13 Administrator
Description: Access Water
  • Browse
  • Compilations
  • Subscriptions
Log in
0
Accessibility Options

Base text size -

This is a sample piece of body text
Larger
Smaller
  • Shopping basket (0)
  • Accessibility options
  • Return to previous
Description: Trenchless Technologies Conquer Design, Planning, and Construction Challenges on a...
Trenchless Technologies Conquer Design, Planning, and Construction Challenges on a Washington, D.C. Area Conveyance Project

Trenchless Technologies Conquer Design, Planning, and Construction Challenges on a Washington, D.C. Area Conveyance Project

Trenchless Technologies Conquer Design, Planning, and Construction Challenges on a Washington, D.C. Area Conveyance Project

  • New
  • View
  • Details
  • Reader
  • Default
  • Share
  • Email
  • Facebook
  • Twitter
  • LinkedIn
  • New
  • View
  • Default view
  • Reader view
  • Data view
  • Details

This page cannot be printed from here

Please use the dedicated print option from the 'view' drop down menu located in the blue ribbon in the top, right section of the publication.

screenshot of print menu option

Description: Trenchless Technologies Conquer Design, Planning, and Construction Challenges on a...
Trenchless Technologies Conquer Design, Planning, and Construction Challenges on a Washington, D.C. Area Conveyance Project
Abstract
Trenchless technologies are an effective tool for efficient project delivery of water and wastewater conveyance systems. Trenchless methods are used to reduce risk and avoid obstacles on projects. From reducing environmental impacts in green-field conditions to reducing traffic congestion in urban environments to conquering exceedingly large depths where slope must be maintained, trenchless technology can be a cost-effective way to successfully deliver challenging conveyance system projects.The Broad Creek Augmentation Project in Maryland consists of 10 such trenchless installations — 8 constructed by microtunneling and 2 by conventional tunneling machine. The Project was implemented by the Washington Suburban Sanitary Commission (WSSC), the water and wastewater utility servicing Prince George’s and Montgomery Counties in Maryland. The Broad Creek Augmentation Project consists of 4.8 miles of new sewer conveyance pipeline, an upgraded and expanded pump station, and wastewater treatment plant upgrades at the discharge end of the pipeline. The pipeline portions of the Project are being constructed under three separate Contracts. The conveyance system improvements consist of the construction of a new parallel conveyance system adjacent to the existing system. Both the existing and new conveyance systems will be used together to attain maximum capacity, but the implementation of valves and junction structures will allow for each system to operate independently if needed. The new conveyance system uses three pipe designs: force main, gravity sewer, and pressure sewer.During the planning and design phases of the Project, several obstacles, design constraints, and a need to reduce impacts to third parties led to the implementation of these trenchless installations. Obstacles included crossings of Broad Creek and Piscataway Creek, two crossings of the highway SR 210, and the crossing of the heavily trafficked Fort Washington Road and Livingston Road intersection. Because the parallel conveyance system is designed to operate independently to permit maintenance, the new pipeline required a continuous downslope to allow for drainage. This resulted in some sections with cover depth so large that the conventional cut and cover methods became impractical and trenchless methods became the more cost-effective alternative. At another location on the Project, the alignment crosses National Park Service property and regulated wetlands. Trenchless methods were used here to reduce a potentially lengthy permitting process by tunneling below the environmentally sensitive area.Trenchless technology is not without its risk, and an appropriate risk assessment, trenchless design, and implementation of mitigation measures are required during the design phase. During design, a risk register was maintained to identify and help mitigate tunneling risks. This information was used in the preparation of Geotechnical Baseline Reports (GBRs) for the Project. WSSC implemented three GBRs, one for each of the three Contracts. The GBRs establish ground conditions and behavior for bidding purposes, provide information on past tunnel construction in the area, and delineate geotechnical risk between the Owner and the Contractor. The Project consists of highly variable and challenging ground conditions ranging from the Aquia Formation consisting of sands and silts, cemented sands, and sandstone corestones, to alluvium containing significant amounts of timber up to 100% of the tunnel face. The GBR baselined expected conditions and stated requirements for all trenchless installations and associated shaft construction.Though the Project is currently in construction, all 10 trenchless installations have been completed, and some sections of the pipeline are in active use.This paper will discuss the following topics:Definition of trenchless technologies and summary of available methodsKey features of the Broad Creek Augmentation ProjectDesign constraints and obstacles that led to the selection of 10 trenchless solutionsAssessment of trenchless methods and ultimate selection of microtunneling and jack and bore methodsStrategy for design and construction of shaftsDevelopment of the Broad Creek GBRs, their implementation during construction, and successes for risk mitigationConstruction issues, solutions, and lessons learned.
Trenchless technologies are an effective tool for efficient project delivery of water and wastewater conveyance systems. Trenchless methods are used to reduce risk and avoid obstacles on projects. From reducing environmental impacts in green-field conditions to reducing traffic congestion in urban environments to conquering exceedingly large depths where slope must be maintained, trenchless...
Author(s)
Trenton CohenDennis FunkDavid Watson
SourceProceedings of the Water Environment Federation
Subject211 Collection Systems Sewer Condition Assessment, Rehabilitation, and Construction
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Sep, 2018
ISSN1938-6478
SICI1938-6478(20180101)2018:17L.478;1-
DOI10.2175/193864718825137692
Volume / Issue2018 / 17
Content sourceWEFTEC
First / last page(s)478 - 496
Copyright2018
Word count634
Subject keywordsTrenchless TechnologyMicrotunnelingPipeline Construction

Purchase price $11.50

Get access
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'Trenchless Technologies Conquer Design, Planning, and Construction Challenges on a Washington, D.C. Area Conveyance Project'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: Trenchless Technologies Conquer Design, Planning, and Construction Challenges on a...
Trenchless Technologies Conquer Design, Planning, and Construction Challenges on a Washington, D.C. Area Conveyance Project
Pricing
Non-member price: $11.50
Member price:
-299533
Get access
-299533
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'Trenchless Technologies Conquer Design, Planning, and Construction Challenges on a Washington, D.C. Area Conveyance Project'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.

Details

Description: Trenchless Technologies Conquer Design, Planning, and Construction Challenges on a...
Trenchless Technologies Conquer Design, Planning, and Construction Challenges on a Washington, D.C. Area Conveyance Project
Abstract
Trenchless technologies are an effective tool for efficient project delivery of water and wastewater conveyance systems. Trenchless methods are used to reduce risk and avoid obstacles on projects. From reducing environmental impacts in green-field conditions to reducing traffic congestion in urban environments to conquering exceedingly large depths where slope must be maintained, trenchless technology can be a cost-effective way to successfully deliver challenging conveyance system projects.The Broad Creek Augmentation Project in Maryland consists of 10 such trenchless installations — 8 constructed by microtunneling and 2 by conventional tunneling machine. The Project was implemented by the Washington Suburban Sanitary Commission (WSSC), the water and wastewater utility servicing Prince George’s and Montgomery Counties in Maryland. The Broad Creek Augmentation Project consists of 4.8 miles of new sewer conveyance pipeline, an upgraded and expanded pump station, and wastewater treatment plant upgrades at the discharge end of the pipeline. The pipeline portions of the Project are being constructed under three separate Contracts. The conveyance system improvements consist of the construction of a new parallel conveyance system adjacent to the existing system. Both the existing and new conveyance systems will be used together to attain maximum capacity, but the implementation of valves and junction structures will allow for each system to operate independently if needed. The new conveyance system uses three pipe designs: force main, gravity sewer, and pressure sewer.During the planning and design phases of the Project, several obstacles, design constraints, and a need to reduce impacts to third parties led to the implementation of these trenchless installations. Obstacles included crossings of Broad Creek and Piscataway Creek, two crossings of the highway SR 210, and the crossing of the heavily trafficked Fort Washington Road and Livingston Road intersection. Because the parallel conveyance system is designed to operate independently to permit maintenance, the new pipeline required a continuous downslope to allow for drainage. This resulted in some sections with cover depth so large that the conventional cut and cover methods became impractical and trenchless methods became the more cost-effective alternative. At another location on the Project, the alignment crosses National Park Service property and regulated wetlands. Trenchless methods were used here to reduce a potentially lengthy permitting process by tunneling below the environmentally sensitive area.Trenchless technology is not without its risk, and an appropriate risk assessment, trenchless design, and implementation of mitigation measures are required during the design phase. During design, a risk register was maintained to identify and help mitigate tunneling risks. This information was used in the preparation of Geotechnical Baseline Reports (GBRs) for the Project. WSSC implemented three GBRs, one for each of the three Contracts. The GBRs establish ground conditions and behavior for bidding purposes, provide information on past tunnel construction in the area, and delineate geotechnical risk between the Owner and the Contractor. The Project consists of highly variable and challenging ground conditions ranging from the Aquia Formation consisting of sands and silts, cemented sands, and sandstone corestones, to alluvium containing significant amounts of timber up to 100% of the tunnel face. The GBR baselined expected conditions and stated requirements for all trenchless installations and associated shaft construction.Though the Project is currently in construction, all 10 trenchless installations have been completed, and some sections of the pipeline are in active use.This paper will discuss the following topics:Definition of trenchless technologies and summary of available methodsKey features of the Broad Creek Augmentation ProjectDesign constraints and obstacles that led to the selection of 10 trenchless solutionsAssessment of trenchless methods and ultimate selection of microtunneling and jack and bore methodsStrategy for design and construction of shaftsDevelopment of the Broad Creek GBRs, their implementation during construction, and successes for risk mitigationConstruction issues, solutions, and lessons learned.
Trenchless technologies are an effective tool for efficient project delivery of water and wastewater conveyance systems. Trenchless methods are used to reduce risk and avoid obstacles on projects. From reducing environmental impacts in green-field conditions to reducing traffic congestion in urban environments to conquering exceedingly large depths where slope must be maintained, trenchless...
Author(s)
Trenton CohenDennis FunkDavid Watson
SourceProceedings of the Water Environment Federation
Subject211 Collection Systems Sewer Condition Assessment, Rehabilitation, and Construction
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Sep, 2018
ISSN1938-6478
SICI1938-6478(20180101)2018:17L.478;1-
DOI10.2175/193864718825137692
Volume / Issue2018 / 17
Content sourceWEFTEC
First / last page(s)478 - 496
Copyright2018
Word count634
Subject keywordsTrenchless TechnologyMicrotunnelingPipeline Construction

Actions, changes & tasks

Outstanding Actions

Add action for paragraph

Current Changes

Add signficant change

Current Tasks

Add risk task

Connect with us

Follow us on Facebook
Follow us on Twitter
Connect to us on LinkedIn
Subscribe on YouTube
Powered by Librios Ltd
Powered by Librios Ltd
Authors
Terms of Use
Policies
Help
Accessibility
Contact us
Copyright © 2024 by the Water Environment Federation
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: WWTF Digital Boot 180x150
WWTF Digital (180x150)
Created on Jul 02
Websitehttps:/­/­www.wef.org/­wwtf?utm_medium=WWTF&utm_source=AccessWater&utm_campaign=WWTF
180x150
Trenton Cohen# Dennis Funk# David Watson. Trenchless Technologies Conquer Design, Planning, and Construction Challenges on a Washington, D.C. Area Conveyance Project. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2019. Web. 1 Jul. 2025. <https://www.accesswater.org?id=-299533CITANCHOR>.
Trenton Cohen# Dennis Funk# David Watson. Trenchless Technologies Conquer Design, Planning, and Construction Challenges on a Washington, D.C. Area Conveyance Project. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2019. Accessed July 1, 2025. https://www.accesswater.org/?id=-299533CITANCHOR.
Trenton Cohen# Dennis Funk# David Watson
Trenchless Technologies Conquer Design, Planning, and Construction Challenges on a Washington, D.C. Area Conveyance Project
Access Water
Water Environment Federation
January 18, 2019
July 1, 2025
https://www.accesswater.org/?id=-299533CITANCHOR